Fwd: [wirksworths_railway] Progress Tuesday and Wednesday 17th/18th October 2017




-----Original Message-----
From: mrailcar@aol.com [wirksworths_railway] <wirksworths_railway-noreply@yahoogroups.com>
To: wirksworths_railway <wirksworths_railway@yahoogroups.com>
Sent: Thu, Oct 19, 2017 5:55 am
Subject: [wirksworths_railway] Progress Tuesday and Wednesday 17th/18th October 2017

 

Hi all

Thanks to Chris Ralls for covering the two new projects of building the crossing keeper boxes at Idridgehay and Gorsey Bank
The Pway team continued sleeper changing between Hazlewood and Shottle and change d 15 on Wednesday.
Another project commenced Yesterday which will see a small platform being constructed at the end of the old ballast dock which will allow the new cherry picker to be loaded onto a flat wagon for use by the PWay to remove the overhanging branches and perform tasks on the bridge and tunnel roofs
55006 was repaired after its braking problems over the weekend which was found to be a hole in the rubber pipe which connects solebar to the bogie

All for now

Mike 

__._,_.___

Posted by: mrailcar@aol.com
Reply via web post Reply to sender Reply to group Start a New Topic Messages in this topic (1)

Have you tried the highest rated email app?
With 4.5 stars in iTunes, the Yahoo Mail app is the highest rated email app on the market. What are you waiting for? Now you can access all your inboxes (Gmail, Outlook, AOL and more) in one place. Never delete an email again with 1000GB of free cloud storage.

JOIN SHARESAVE!

Becoming a shareholder of WyvernRail has just become easier!  Join ShareSave and invest in your railway for just 10 Pounds a month.

See www.e-v-r.com/ShareSave for details.

.

__,_._,___