The warmer weather and a little sun gave us all a little extra spring in our steps with the usual large turnout of volunteers
The PWay team received another delivery of 200 sleepers which will be used to replace rotten ones between Hazlewood and Duffield. Track patrols commenced now the operating season starts on Saturday
Barclay Henry Ellison had its firebars and brick arch replaced and was fired to check for leaks prior to next weeks boiler inspection. Work continued on the fabrication of the lubrication system for Cathryn and the crossheads and slippers
The DMU team vaxed the carpets in Railcar 119  W51073 and repaired some areas of EVRA's SO doors