Saturday, 19 March 2016

Progress Saturday 19th March 2016

Hi all

The chill factor in the wind obviously reduced our passenger numbers but it was a profitable day and was supported by the Model Railway and Pullman Buffet plus the EVRA shop.
The LMSCA continued on the interior woodwork of their LMS coach and the BSK was prepared for priming. The EVRA SO also received some more work to its interior
The DUKE received some more miscellaneous parts and further work continued on the boiler
The DMU group changed a leaking radiator on MET Camm 50253 and  Bubble car 55006 had all its 26 seat backs fitted.

All for now

Mike Evans