Saturday, 28 February 2015

Progress Saturday 28th February 2014.

Hi All
A Fairly busy Day for a Winter Service. The model railway,EVRA
Shop and Pullman Buffet all gave our visitors extra interest.
The LMSCA also continued with their two Coaches.The Duke
received preparatory work on its Boiler before removal to Loughborough
for refurbishment.
The DMU Group prepared 50599s Gearbox for removal,sanded the
Pways Bubble East Side and sealed 50253s leaking windows.

All the best

Mike Evans