Sunday, 3 March 2013

Railway progress Saturday 2nd March

Our first full day of the season got underway with the sun shining through albeit still a bit chilly  as the 31 pulled the first of the four runs to Duffield
and the 3 car looking after the Ravenstor service. A steady number of visitors enjoyed the day and many graced the delight of the Pullman Buffet

Down the yard The  Dmu group had a good day as the injectors on the 119 were fixed and the engine sparked into life once again and  the control area was recovered and was  looking very smart once again

The 8f group were well on the way to cutting out the tubes of  Catherine

The lmca were well underway with all their numerous prodjects
T
he walk way in the mainaince shed was also well under way to completion

A good day all in all  so many thanks to all the staff who worked hard today and from the feed back an enjoyable day was had by all

ATB

John