Monday, 14 September 2009

Mon 14th Sept

Evenin' all,

A reasonably bright day saw preperartions for the upcoming work at
Duffield getting started.

The extra strong IMT walked the Duffield - Derby oad 4 bridge, they
found various loose bits of rail on gthe 'yet to be rebuilt' stretch
and some remedial action was taken. Various G clamps were taken off
and replacement bolts installed.

Some drainage survey work was also undertaken at Duffield, where some
new drainage work is required.

Back in the yard, locos were checked over ready for the fray!
A few visitors came for a look around.

Tomorrow sees locos leaving wirksworth and bringing back stock from
Shottle
Phil