Friday, 1 May 2009

Fri 1st May

Evenin' all,

A day, busy with preperation for this weekend.With trains being
prepared and shunted, and exhibits moved onto Platform 1 road.

The flail head continued with its rebuild and more stengthening was
built in. some hammers were replaced.

Weedkiller was applied at Wirksworth, Gorsey Banl LC, Ideridgehay LC
and through the station, at Hazlewood Access point and Duffield
platform and yard.

The Infrastucture Maintenance Team dug out four sleepers at Wash Green
that had started 'pumping' these were repacked, they also started
routine maintenance on the Racing Straight, now that the water table
has dropped, and the formation is drying out, some repacking is
required at sleeper ends. A patro;l of the Incline also took place.

The fence between the Booking Hall, and the old Dust dock was treated
to some creosote (or the mamby pamby stuff that calls itself creosote
these days)

The Booking Hall was kept busy with incoming supplies and visitors.

Phil